Inspection Past Experience For December 2024
| Job Number |
Job Date |
Company |
RIG |
Location |
Description |
Details |
| 306 |
8/12/2024 |
SinoTharwa |
9 |
GPC - BAKR-163 |
LIFTING |
LOAD TEST |
| 311 |
10/12/2024 |
SinoTharwa |
4 |
G.P.C |
MPI-WALL THICKNESS-LOAD TEST |
MPI-WALL THICKNESS-LOAD TEST |
| 307 |
12/12/2024 |
SinoTharwa |
2 |
EFCO-MACHINE SHOP - Repair |
Tubular |
SUBS |
| 310 |
12/12/2024 |
THO |
|
FUTURE WORKSHOP |
SHEARWAVE |
SHEARWAVE |
| 295 |
13/12/2024 |
South Dabaa |
EDC RIG 63 |
SWA 10-1 X |
TUBING |
TUBING |
| 312 |
16/12/2024 |
SinoTharwa |
2 |
EFCO-MACHINE SHOP - Repair |
Tubular |
DP |
| 313 |
16/12/2024 |
SinoTharwa |
12 |
EFCO-MACHINE SHOP - Repair |
Tubular |
DP-HWDP |
| 314 |
18/12/2024 |
SinoTharwa |
9 |
G.P.C |
MPI |
MPI |
| 315 |
20/12/2024 |
SinoTharwa |
2 |
NORPETCO |
TUBULAR-SHEARWAVE |
SHEARWAVE - HWDP-SUBS-DC |
| 296 |
20/12/2024 |
South Dabaa |
Ghareb |
SWA 1-1 X |
TUBING |
TUBING |
| 317 |
26/12/2024 |
SinoTharwa |
2 |
EFCO-MACHINE SHOP - Repair |
TUBULAR |
SUBS-HWDP |
| 323 |
26/12/2024 |
Shelf Drilling |
141 |
Zait Bay & Zaafarana |
LIFTING-MPI-ROPE ACCESS |
LIFTING-MPI-ROPE ACCESS |
| 318 |
29/12/2024 |
ECDC |
1 |
PICO-WORK SHOP - Repair |
TUBULAR |
SUBS |
| 319 |
29/12/2024 |
ECDC |
10 |
PICO-WORK SHOP - Repair |
TUBULAR |
DC |
| 320 |
31/12/2024 |
SinoTharwa |
12 |
East Sanan ( Alamin ) |
TUBULAR |
DP-HWDP |
| |
|
|
|
|
|
|
|